2019
Jan Introduced one Japanese Shimizu compound drawing machine, the first drawing production line in the province that can produce a maximum specification of 50mm, so far, 10 fully imported drawing machine production lines have been completed.
Mar Developed customized automatic packaging unit.
Apr Ningbo GOSUN branch was established.
Sept Added spheroidizing annealing furnace equipment.
Oct The second phase of the construction of a new plant of 3,333 sq. meter has started.
Nov Passed the ISO14001 environmental certification system.
- PreviousNo Information
- Next2018